view article

Figure 6
Scheme of the Farey tree between 8/5 and 5/3. A phase [n/m] is defined from the two generators indicated by dotted lines, [n1/m1] and [n2/m2], as [n/m] = [(n1 + n2)/(m1 + m2)].

Journal logoSTRUCTURAL SCIENCE
CRYSTAL ENGINEERING
MATERIALS
ISSN: 2052-5206
Follow Acta Cryst. B
Sign up for e-alerts
Follow Acta Cryst. on Twitter
Follow us on facebook
Sign up for RSS feeds