view article

Figure 1
CM01 infrastructure. (a) Location of CM01 in the Belledonne extension of the experimental hall of the ESRF. (b) Schematic top view of CM01 showing the experimental hutch (EH) in blue, the technical gallery in yellow and the control cabin (CC) in violet. (c) The CM01 experimental hutch (grey room) showing the Titan Krios microscope (1), the duct sock porous mesh for uniform air flow (2), SF6 extraction (3) and the acoustic damping sheets (4) behind which the high-voltage generator is located. (d) Technical gallery, where the chiller unit (indicated) is placed. (e) The large CM01 control cabin.

Journal logoSTRUCTURAL
BIOLOGY
ISSN: 2059-7983
Follow Acta Cryst. D
Sign up for e-alerts
Follow Acta Cryst. on Twitter
Follow us on facebook
Sign up for RSS feeds