|
Figure 5
Change in completeness, Rwork and Rfree between the released pipeline and the chain-pruning pipeline. The 867 structures were divided into ten resolution bins and the mean and standard error of the change for each bin is shown. |
|
Figure 5
Change in completeness, Rwork and Rfree between the released pipeline and the chain-pruning pipeline. The 867 structures were divided into ten resolution bins and the mean and standard error of the change for each bin is shown. |