view article

Figure 7
Timing of the events controlled by the CITY module. The Q-switch delay is typically 290 µs (light red), the laser-pulse duration is 3–5 ns (dark red), the pump–probe time delay is usually varied between 2 µs and 12 s (grey), the xenon-flash lamp pulse duration is 2 µs (blue) and the spectrophotometer acquisition window is set to 100 µs (orange).

Journal logoSTRUCTURAL
BIOLOGY
ISSN: 2059-7983
Follow Acta Cryst. D
Sign up for e-alerts
Follow Acta Cryst. on Twitter
Follow us on facebook
Sign up for RSS feeds