Figure 14
Data from cement after being sprayed with water, taken at 1 min intervals. This gives an indication of the change in lattice parameters during hydration and recovery after dehydration. The upper profile is the projection of the intensity from 15–40 min after dehydration. The sample was rocked during data collection and the start of data collection was ∼10 s after spraying. |