Figure 2
The numbers of predicting variable combinations that yield corresponding prediction models with R2 larger than 0.90 for different problems: (a) the prediction of Eform for the AB materials, (b) the prediction of Lconst for the b.c.c. AB materials and (c) the prediction of magnetic phase-transition temperature TC for the rare earth–transition metal alloys. |