view article

Figure 6
Test results at the APS undulator beamline 1-ID front end showing the apparent X-ray vertical beam position measurement at the front-end first XBPM with and without the DSP-based smart system, for varying undulator gaps from 11 to 30 mm.

Journal logoJOURNAL OF
SYNCHROTRON
RADIATION
ISSN: 1600-5775
Follow J. Synchrotron Rad.
Sign up for e-alerts
Follow J. Synchrotron Rad. on Twitter
Follow us on facebook
Sign up for RSS feeds