|
Figure 2
An aerial view of the SPring-8 facility. The storage ring is built around a small hill. The injectors are built at a level 10 m below the level of the storage ring. |
|
Figure 2
An aerial view of the SPring-8 facility. The storage ring is built around a small hill. The injectors are built at a level 10 m below the level of the storage ring. |