|
Figure 3
Lower panel: the beam current history prior to top-up operation (red) and with top-up operation (blue). With top-up injection, the current appears steady at 500 mA. Top panel: top-up on an expanded scale. |
|
Figure 3
Lower panel: the beam current history prior to top-up operation (red) and with top-up operation (blue). With top-up injection, the current appears steady at 500 mA. Top panel: top-up on an expanded scale. |