view article

Figure 6
Design of the time-resolved set-up at SUL-X within the vacuum chamber. An independent miniature goniometer for a vertical scattering plane together with the APD detector arm. A motorized lens stage provides the means for aligning the laser focus relative to the X-ray focus. The laser is coupled in via the vacuum windows.

Journal logoJOURNAL OF
SYNCHROTRON
RADIATION
ISSN: 1600-5775
Follow J. Synchrotron Rad.
Sign up for e-alerts
Follow J. Synchrotron Rad. on Twitter
Follow us on facebook
Sign up for RSS feeds