Figure 10
Top: trajectory of the injected bunches in the MAX IV 3 GeV storage ring starting at the septum (Leemann, 2012b). The PSM is installed in the second long straight and kicks the injected bunch into the ring acceptance. Bottom: tracking of injection and capture of 1000 particles at the septum in the 3 GeV storage ring. The first five turns are indicated in blue. For comparison, the stored beam is indicated in red. |