Figure 7
Selected process parameters [(a) and (c)] and stationary in situ measurements [(c) and (d), black dotted lines] at high and low working gas pressure, respectively. The mean value of the intensity is marked by a purple line. Simulations are presented with red lines. The orange line marks the beginning of steady growth conditions. |