Figure 2
(a) Scheme of the experimental setup: a TTL signal initiates periodic switches between two gas flows in the cell and triggers the signal generator (SG) to produce a train of a fixed number of pulses that control the data acquisition system for the SDD detector (Det). (b) Vertical scan along the reactor cell using the Ce Lα fluorescence signal showing the beginning and the end of the catalyst bed with respect to the direction of the gas flow. The inset shows a TEM image of 1.5 wt% Pt/CeO2 catalyst (Pt nanoparticles are indicated by arrows). |