[HTML version][PDF version][Article Abstract][CIF][3d view][Structure Factors][Issue contents]  [Buy article online]

[Contents scheme]

Acta Cryst. (2002). E58, m519-m520  [ doi:10.1107/S1600536802015787 ]

Bis([mu]-N-(3-[3-indenyl]propyl-p-toluenesulfamido-N,O,O')-dimethylamidodichorotitanium)

C. Lensink, G. J. Gainsford and M. J. R. Brandsma

Online 13 September 2002


Key indicators

checkCIF results

No syntax errors found

ADDSYM reports no extra symmetry


Amber Alert Alert Level B:
ABSTM_02 Alert B The ratio of expected to reported Tmax/Tmin(RR') is < 0.75 Tmin and Tmax reported: 0.393 0.892 Tmin' and Tmax expected: 0.771 0.892 RR' = 0.510 Please check that your absorption correction is appropriate.
Author response: The ratio given is that given in summary after the SADABS run; It seems possible that the smallest dimension is inaccurate, but the crystal is no longer available to be re-measured.

0 Alert Level A = Potentially serious problem
1 Alert Level B = Potential problem
0 Alert Level C = Please check

Copyright © International Union of Crystallography
IUCr Webmaster