Figure 1
(a) Installation of the 2.5 GeV storage ring has started. One of the 16 cells of the SESAME storage ring assembled on the girder. The components were constructed in collaboration between SESAME members and observers with magnets assembly coordinated by CERN. Dipole magnets were manufactured in the UK, sextupoles coils in France, quadrupoles and girders in Spain, vacuum chambers in Germany, sextupoles in Pakistan and quadrupoles coils in Turkey. (b) Director of SESAME Khaled Toukon, DG CERN Rolf Heur, Coordinator CERN–SESAME collaboration Jean-Pierre Koutchouk and current President of SESAME Sir Chris Llewellyn Smith admiring the magnets. (c) Delegation in the experimental hall of SESAME. (d) SESAME with new white roof. |