view article

Figure 6
Position of the measured area on a SUT using the NT method. Here, p1 and p2 are measured positions on the SUT, and dcc, dpp, h, [h^{\,\prime}] and [\beta] are the pinhole distance of the measured area at position p1 and p2, the horizontal distance from p1 to p2, the distance from the pinhole to the SUT, the distance for calculating the precise position of the measured area, and the slope difference of p1 and p2, respectively.

Journal logoJOURNAL OF
SYNCHROTRON
RADIATION
ISSN: 1600-5775
Follow J. Synchrotron Rad.
Sign up for e-alerts
Follow J. Synchrotron Rad. on Twitter
Follow us on facebook
Sign up for RSS feeds