view article

Figure 2
Downstream view along the SASE1 undulator system during installation. The walls for the temperature stabilized enclosure are normally in place and closed as seen in the rear. In the front they are temporally removed for access.

Journal logoJOURNAL OF
SYNCHROTRON
RADIATION
ISSN: 1600-5775
Follow J. Synchrotron Rad.
Sign up for e-alerts
Follow J. Synchrotron Rad. on Twitter
Follow us on facebook
Sign up for RSS feeds