Figure 22
Veritas PGM in closed loop was standing still for one week while the energy was sampled. Mid-week, the cooling water was turned on increasing the noise from 3 meV to 7 meV. |
|
Figure 22
Veritas PGM in closed loop was standing still for one week while the energy was sampled. Mid-week, the cooling water was turned on increasing the noise from 3 meV to 7 meV. |