Figure 13
Floor plan of HED experiment hutch with the positions of IC1 (right, rectangular), IC2 (center, round) and the AGIPD on the detector bench on the left. The XFEL beam enters from the right. The dark-gray areas indicate hutch infrastructure, while the orange areas mark access paths. Dimensions are given in millimetres. |