view article

Figure 2
(Left) The experimental setup within Hutch 2B of the Imaging and Medical Beam Line at the Australian Synchrotron, featuring the 10 µm thick transmission detector in front of the second in-air ionization chamber, IC2. (Right) The experimental setup of the 375 µm thick transmission detector in front of the second in-air ionization chamber.

Journal logoJOURNAL OF
SYNCHROTRON
RADIATION
ISSN: 1600-5775
Follow J. Synchrotron Rad.
Sign up for e-alerts
Follow J. Synchrotron Rad. on Twitter
Follow us on facebook
Sign up for RSS feeds