|
Figure 1
(a) Scheme (top) and photograph (bottom) of the custom-made chip holder. (b) Scheme of the vacuum setup in the configuration adopted for the FERMI and Elettra beam times. (c) Setup installed at the CiPo beamline. |
|
Figure 1
(a) Scheme (top) and photograph (bottom) of the custom-made chip holder. (b) Scheme of the vacuum setup in the configuration adopted for the FERMI and Elettra beam times. (c) Setup installed at the CiPo beamline. |