view article

Figure 1
SAXSTT measurement setup and probed directions. (a) Full setup with detector, goniometer with sample mounted on a pin, X-ray source and measurement coordinate system. (b) Initial sample mounting during first measurement and initial orientation of sample coordinate system. (c) Initial sample mounting during second measurement. (d) Points on the sphere of projection probed during first measurement. (e) Points probed during second measurement. The points on the sphere of projection give the coordinates of the projection direction p in the sample coordinate system spanned by xy and z.

Journal logoJOURNAL OF
SYNCHROTRON
RADIATION
ISSN: 1600-5775
Follow J. Synchrotron Rad.
Sign up for e-alerts
Follow J. Synchrotron Rad. on Twitter
Follow us on facebook
Sign up for RSS feeds