view article

Figure 8
New SLS 2.0 HP slits. Left: photograph of the assembled HP slits ready for installation. Middle: 3D model of HP slits showing construction details. Right: front view of the two slits. The first slit trims the lower and right part of the beam, while the second slit trims the upper and left part.

Journal logoJOURNAL OF
SYNCHROTRON
RADIATION
ISSN: 1600-5775
Follow J. Synchrotron Rad.
Sign up for e-alerts
Follow J. Synchrotron Rad. on Twitter
Follow us on facebook
Sign up for RSS feeds