|
Figure 7
Holographic imaging of the melt pool with increasing time steps, (a) 0 ms, (b) 0.75 ms and (c) 0.9 ms, at 700 W of power measured on the Zyla detector. |
|
Figure 7
Holographic imaging of the melt pool with increasing time steps, (a) 0 ms, (b) 0.75 ms and (c) 0.9 ms, at 700 W of power measured on the Zyla detector. |