view article

Figure 4
Source size measurements at the APS 1-BM-B beamline. (a) and (c) show the interferogram periods pz as a function of z with linear fits, while (b) and (d) present the visibility curves V(z) with fits based on equation (3)[link]. Acquisition time for each interferogram is 100 ms.

Journal logoJOURNAL OF
SYNCHROTRON
RADIATION
ISSN: 1600-5775
Follow J. Synchrotron Rad.
Sign up for e-alerts
Follow J. Synchrotron Rad. on Twitter
Follow us on facebook
Sign up for RSS feeds