Figure 1
(a) The device at BL41XU. (b) A configuration diagram of the device. (c) A drawing of the LN2–gas separator. (d) The LN2–gas separator at BL26B2 (before installing the insulation tube). (e) A close-up view of the device at the sample position (the device is shown in pink). |