Figure 7
Volume of experimental data collected since calendar year 2015 at the 1-ID beamline obtained from the DM system catalogue. Note that the DM system was first installed at the 1-ID beamline in 2015. The plotted data are as of August 2018 and we anticipate similar data levels for 2018 as in 2017. |