|
Figure 3
(a) Trace of the parameters sampled with random-walk MCMC. (b) Auto-correlation of the parameter samplings. The red dashed lines are 95% confidence bounds. |
|
Figure 3
(a) Trace of the parameters sampled with random-walk MCMC. (b) Auto-correlation of the parameter samplings. The red dashed lines are 95% confidence bounds. |