view article

Figure 2
Experimental 45° set-up at BL13-XALOC. (a) Schematic diagram of the high-viscosity injector operation system showing all equipment and parts used for the set-up. A conventional FPLC pump was used. Helium was used as sheath gas in all our experiments. (b) High-viscosity injector (Weierstall et al., 2014BB56) mounted on translation stages. The inset panel shows a closer view of the LCP stream extruding from a 50 µm glass capillary nozzle. The red arrow indicates the position of the X-ray beam.

Journal logoJOURNAL OF
SYNCHROTRON
RADIATION
ISSN: 1600-5775
Follow J. Synchrotron Rad.
Sign up for e-alerts
Follow J. Synchrotron Rad. on Twitter
Follow us on facebook
Sign up for RSS feeds