view article

Figure 8
The BIMS collected 40000 data points at a 1 kHz frequency to validate the synchronization between the two IDMs. The red curve represents data from the URIDM, while the blue curve shows the measurement from the DIIDM. (a) The originally collected data and (b) the data fitting and analysis of the magnified section in (a), showing the high synchronicity between the two IDMs.

Journal logoJOURNAL OF
SYNCHROTRON
RADIATION
ISSN: 1600-5775
Follow J. Synchrotron Rad.
Sign up for e-alerts
Follow J. Synchrotron Rad. on Twitter
Follow us on facebook
Sign up for RSS feeds