view article

Figure 9
Operational results of the GUI tool based on 124 execution logs collected over 15 months (14 April 2024 to 15 July 2025): (a) frequency distribution of the beam-flux ratios, with 107 runs with improvements in the beam-flux ratio and 17 runs with no changes in the parameter; (b) frequency distribution of the alignment times, with a modal interval of 4–6 min.

Journal logoJOURNAL OF
SYNCHROTRON
RADIATION
ISSN: 1600-5775